Cleared back slabbed area for extension
Extension location
Adjourning neighbours
Clearing area ready for footing tenches
Start of digging footings
Footing dug out
Expose front drainage pipes
Base for front manhole
Manhole being built for ensuite in extension
Soil pipes from extension
All pipework and footings concreted
Extensions area set out as per plan, floor preparation for concrete floor
Area of extension
Slab and visqueen and insulation
2nd layer of visqueen
Concrete slab
Extension block work
Flat roof
External extension view
Internal extension view
Setting out finish floor
Doorway through to living room
Finish floor completion ready for internal work
GRP Fiberglass roofing
Joining main house roof
Internal plastering to main house
Internal Plastering
Extension plaster boarded with ceiling covings
External extension and slabbing surround
Extension adjoining next door neighbour's completed
Extension view completion
Extension back view
Outside extension completed
Outside extension completed 2
Extension bedroom completed
Extension bedroom completed 2
View from en-suite
Extension en-suite bathroom completed
Doorway from extension to living room
Living room in main house completed
Kitchen in main house completed
Kitchen in main house completed 2
Kitchen in main house completed 3
Dining room completed